Phones answered 24/7San Jose, CA 95113
Call (833) 751-2102
Phones answered 24/7Call any time(833) 751-2102
Serving Santa Clara County

Tear-Off and Re-Roof for San Jose's Older Houses, Including Willow Glen

Stripping an original or heavily patched roof to the deck, replacing soft boards and rafter ends, and laying a new covering with the ventilation and flashing re-made together.

  • Santa Clara Valley roofs
  • Storm and leak repairs
  • Roof replacement

Get a fast quote

Fastest: call (833) 751-2102. Or send this and we call you back.

Original Stock Re-Roof

Original Stock Tear-Off and Re-Roof: what it covers

Quick answer

A tear-off on an older house strips the old covering to the deck, so the boards, the rafter ends and the flashings can be checked and renewed before a new covering goes on. In Willow Glen, where many roofs are original 1920s to 1950s stock, a tear-off is often the only way to see what the deck has become after decades of weather.

Original Stock Tear-Off and Re-Roof illustration for San Jose, CA

Willow Glen is a San Jose neighborhood of older houses and bungalows, about 5 km south-west of downtown, and many of its roofs are original 1920s to 1950s stock. A roof of that age has usually been patched more than once, and each patch sits on a deck that has been wet and dried for a long time.

A re-cover over a failed deck only hides the failure. The tear-off is the honest way to see the deck, and it is the time to re-make the flashings and the vents that the new covering must lap over.

Service area
San Jose & Santa Clara County
Availability
Phones answered 24/7
Warning signs

Signs you need original stock tear-off and re-roof

A tear-off exposes soft decking and can leave holes in the roof surface. The crew works from boards laid across the rafters, keeps the edges guarded and does not allow anyone to stand on a soft section. Fall protection is used on every slope.

  • Two or three layers of covering showing at the eave or the rake edge
  • A deck that gives underfoot in several places across one slope
  • Plank sheathing with gaps wide enough to show daylight from the attic
  • Rafter tails at the eave that are soft or split
  • Vent openings that were covered over by an earlier worker
  • Patched areas where the covering changes color or profile across one slope
Our process

How our original stock tear-off and re-roof visit works

  1. Count the layers and cut a test patch

    A small test patch is cut to count the layers and to see the deck material. Plank, plywood and older board each need a different approach to fixing and to repair.

  2. Strip to the deck and read it

    All layers are removed and the deck is read board by board. Soft or split boards are marked, and the rafter tails at the eave are probed for rot before anything is fixed back.

  3. Replace the failed boards and the flashings

    Soft boards are replaced with boards of the same thickness, and the rafter ends are sistered or replaced where they have failed. Each flashing at a vent, chimney or wall is re-made so the new covering laps over it.

  4. Lay the underlayment and the covering

    The new underlayment is lapped from the eave upward, the drip edge is fixed along the eave and rake, and the covering is laid to the manufacturer's pattern. The vents are reopened and paired so the attic can breathe.

Job stories

Typical jobs for original stock tear-off and re-roof

Typical job
Illustration: A stain under an original roof leads to a soft rafter end

A stain under an original roof leads to a soft rafter end

What homeowners notice
An original house from the 1920s shows a stain along the eave of a back bedroom. The covering has been patched in several places and the fascia beneath the gutter has begun to soften at one corner.
What we do
The crew strips the covering on the affected slope to the deck, probes the rafter tails and finds two that have rotted at the eave. The rafter ends are cut back to sound grain and sistered, the flashings at the chimney are re-made and the new covering is laid over fresh underlayment.
What to expect
The slope is covered and the attic is dry on the next check. The owner keeps the scope, which records the rafter ends replaced and the flashings renewed, with the photographs of the deck.

2-3 days typical visit

What do roofs of the 1920s to 1950s usually show?

Roofs of that period usually show several rounds of repair, a deck that was built with its own nailing practice, and flashings that have aged in place. None of that is unusual, and each needs a check before a new covering is laid.

Many original roofs were covered once and then repaired over the years rather than replaced. The patches show where the water has been, and the technician reads them as a record of the faults the roof has had.

Decks of that period may be plank or early panel sheathing. The boards can be sound while the nails that hold them have worked loose, and a new covering fixed to loose nails will lift at the first wind.

Why is a re-cover over a failed deck a false economy?

A new covering over a failed deck hides the failure and fixes the new covering to boards that cannot hold it. The fault then shows in the first storm as a lifted edge or a leak that is hard to trace.

A covering nailed into a soft board pulls out under wind load, and the nails that were meant to hold it fail one by one. The owner then has a new roof that leaks where the old one was failing, and the damage is harder to repair because the new covering must be removed first.

The tear-off is therefore the more honest option when the deck is in doubt. It costs more time, and the scope says why.

How are the rafter ends and the eave checked?

The rafter ends at the eave are the part of the structure most exposed to water that runs off the roof and into the fascia. They are probed for softness and split grain and replaced where the wood has failed.

A soft rafter end is found by probing with a screwdriver or an awl. Sound wood resists the probe, and rotted wood gives easily. The affected length is cut back to sound grain, and a new piece is fixed alongside or in place.

The fascia behind the gutter is checked in the same visit, since a soft rafter end is usually matched by a soft board in front of it.

What is re-made on the roof before the covering goes on?

The flashings at the chimney, the vents, the wall junctions and the valleys are re-made before the covering is laid, so the new covering laps over metal that will last with it.

Old flashing is often lead, galvanised steel or a bituminous strip that was fixed by an earlier worker. Where it is in good condition, it can be kept and lapped under the new covering. Where it has failed, a modern metal piece is fitted.

The vents are reopened and the soffit intake is cleared, so the attic air can move from the eave to the ridge once the covering is on.

How do the flashings and the valleys on an original roof get re-made?

The flashings and valleys on an original roof are often the parts that failed first. They are re-made in the same operation as the covering, so the new covering laps over metal that will last with it.

An original valley is often a single strip of metal or a built-up layer of felt. Where the strip has rusted or the felt has split, the valley is re-lined with a new metal and the covering is lapped over it, so water runs down the valley rather than into the deck.

Chimney and wall flashings are checked for lift and sealant failure. Where the masonry has cracked or the lead is brittle, a new flashing is cut and fitted. The scope names each one, with the material chosen for the exposure and the original detail where it can be kept.

What does the owner receive at the end of a tear-off?

The owner receives a written account of the layers removed, the boards and rafter ends replaced, the flashings re-made and the covering fitted, with photographs of the deck before the new layer went on.

The photographs are kept with the scope, so a later repair, a sale or a claim has a record of what was under the roof. The owner also receives the covering type, the underlayment used and the vents reopened.

No warranty is stated on this page. Any manufacturer or workmanship promise is written in the owner's contract and read before signing.

How are the decking and the sheathing paid for in the scope?

The decking and sheathing are named as separate lines in the scope, with the number of boards or sheets and the reason for each. A board replaced because it was soft is recorded, and so is a board that was sound and left in place.

A scope that names only the covering hides the deck work inside a single total. The owner should see the boards replaced and the rafter ends sistered, so the work is visible and can be checked against the photographs taken on the day.

The count is made on the deck itself. A soft board is marked, measured and replaced, and the count is written into the scope before the new underlayment goes down.

Options

Types and options for original stock tear-off and re-roof

Full tear-off to the deck

The usual choice when there is more than one layer or when the deck is in doubt. It gives the clearest view of the deck and the framing.

Tear-off of one slope

One slope is stripped and re-covered where the damage is concentrated and the other slopes are sound. The new covering is matched to the old as closely as the stock allows.

Santa Clara County

Why original stock tear-off and re-roof is different in Santa Clara Valley

Willow Glen is about 5 km south-west of San Jose's downtown and is known for its older houses and bungalows, many of them original 1920s to 1950s stock.

The neighborhood's roofs are often reached from narrow side streets, so the crew plans its materials and its skip before the strip begins.

San Jose's central ZIP 95125 covers Willow Glen, and the tear-off scope names the deck and the framing as well as the covering.

Original roofs in the older parts of the valley are often reached from side streets, and the crew plans the skip and the materials before the first strip is lifted.

One call and it gets handled.

Tell us when you need someone and we book the earliest visit a original stock tear-off and re-roof technician has, and you approve the price before any work starts.

Related

Shingle Recover and Deck Check

A shingle recover over a single sound layer, or a full re-roof where the layers or the deck say so, with the deck and the ventilation checked before the new covering is fixed.

Ridge and Hip Repair

Re-setting and re-fixing loose ridge and hip pieces, re-bedding the joints and sealing the ridge line so the top of the roof sheds water in every wind.

Skylight Flashing and Kerb Replacement

Re-making the kerb flashing and re-sealing the frame of a skylight or roof window, with the glazing and the ceiling below tested before the work is signed off.

Roof Replacement Scope and Licence Check

A line-by-line scope for any roof job in San Jose, with the C-39 licence and the workers' compensation certificate checked before the first nail is driven.

Guides

Read before you book

FAQ

Original Stock Tear-Off and Re-Roof FAQs

Does an old house always need a tear-off?

Not always. A single sound layer on a firm deck may take a re-cover. The technician counts the layers and reads the deck before recommending either.

Will the tear-off damage the plaster inside?

The crew protects the ceilings and the walls below the strip, and the attic is cleared as work goes on. The technician records any damage that occurs so it can be repaired.

Can the original look be kept?

A close match of the covering is often possible. The technician tells you where a new material will show, and the scope names the covering chosen.

WhatsApp